GLWS · Colocation

Your hardware.
A place to run it.

Rack space, power and a network connection for hardware you own. Plan access, remote hands and recovery before you ship a machine.

Rack space for your own hardware.

Monthly prices in GBP. You supply the equipment.

Single server

£99.00/ month
  • 1U–4U rack space
  • 150 W allocation
  • 10 TB transfer
  • 1Gbps port
  • 1 IPv4
  • Your own equipment
Choose this plan

Half rack

£599.00/ month
  • 20U rack space
  • 1.5 kW allocation
  • 60 TB transfer
  • 1Gbps port
  • 16 IPv4
  • Your own equipment
Choose this plan

Plan more than rack units.

The details that decide whether a move goes smoothly.

Equipment dimensions

Confirm rail compatibility, depth, weight, cable routing and access space before delivery.

Power requirements

Record sustained and peak draw, connector types and the behaviour of redundant supplies.

Network handoff

Agree on ports, addressing, routing, management access and the expected traffic profile.

Remote hands

Define authorised tasks, contact details and the approval process for physical work.

Equipment inventory

Record serial numbers, ownership and the delivery and removal procedure.

Recovery procedure

Keep recovery media and configuration notes available to the people authorised to use them.

A move-in checklist.

Four steps for a smooth handover.

  1. Inventory the equipment. Record dimensions, serial numbers, rails and connectors.
  2. Confirm the resource budget. Match rack, power and network requirements to the planned allocation.
  3. Prepare access and recovery. Document out-of-band access and the authorised contacts.
  4. Test after installation. Verify interfaces, storage health, monitoring and backups.

Common questions.

Clear up responsibilities before you ship hardware.

Who owns the equipment?

You do. Colocation is for hardware you own. We describe space, power and connectivity, not supplied servers.

Is remote hands included?

Not as an unlimited or free service. Physical work needs an agreed scope, authorisation and charges.

Are the power figures guaranteed?

They are planning budgets. Actual limits and availability depend on arrangements confirmed with the facility.

Can I ask for a different footprint?

Yes. Use the contact page and include rack units, depth, power, ports and recovery access.